Premier Manufacturer of Erosion and Sediment Control Products


 

Contractor Resources

Western Excelsior is dedicated to providing the erosion and sediment control installers and contractors with a database of tools to educate and inform. Contained within this database is an archive of Western Excelsior press releases, installation instructions, and updates as to the state of the practice in use and installation of Rolled Erosion Control Products and Sediment Control Products.

View Press Release Archive
  • Historical Press Releases
  • Current Press Release
  • Western Excelsior Company Information
  • www.westernexcelsior.com upgrades

  • View E3C Archive
  • Western Excelsior's Excel Erosion Education Circular (E3C) archive

  • View Regulatory Approvals
  • Database of Excel products approved by state or regulatory body


  • Installation and Use Updates

    The following documentation is provided to aid in selection of the most appropriate Western Excelsior Rolled Erosion Control Product for jobsite conditions. For questions regarding installation specifics or non-standard applications, please contact Western Excelsior.

    Date   Title
     
     
     
     

    Installation Instructions

    Each Western Excelsior RECP is installed with a product-specific stapling pattern. The general guidelines are similar, however, for all RECPs. The general procedures are as follows.

    Slope Instructions

    Slope Installation Diagram
    Step 1 - Site Preparation
    Prepare site to design profile and grade. Remove debris, rocks, clods, etc.. Ground surface should be smooth prior to installation to ensure blanket remains in contact with slope.


    Step 2 - Seeding
    Seeding of site should be conducted to design requirements or to follow local or state seeding requirements as necessary.


    Step 3 - Staple Selection
    At a minimum, 6" long by 1" crown, 11 gauge staples are to be used to secure the blanket to the ground surface. Installation in rocky, sandy or other loose soil may require longer staples.


    Step 4 - Excavate Anchor Trench and Secure Blanket
    Excavate a trench along the top of the slope to secure the upstream end of the blanket. The trench should run along the length of the installation, be 6" wide and 6" deep. Staple blanket along bottom of trench, fill with compacted soil, overlap blanket towards toe of slope and secure with row of staples (shown in Figures A, B and D).


    Step 5 - Secure Body of Blanket
    Roll blanket down slope from anchor trench. Staple body of blanket following the pattern shown in Figure D. Leave end of blanket unstapled to allow for overlap shown in Figure E. Place downstream blanket underneath upstream blanket to from shingle pattern. Staple seam as shown in Figure D. Secure downstream blanket with stapling pattern shown in Figure C. Stapling pattern shown in Figure C reflects minimum staples to be used. More staples may be required to ensure blanket is sufficiently secured to resist mowers and foot traffic and to ensure blanket is in contact with soil surface over the entire area of blanket.


    Step 6 - Continue Along Slope - Complete Installation
    Overlap adjacent blankets as shown in Figure F and repeat Step 5. Secure toe of slope using stapling pattern shown in Figure D. Secure edges of installation by stapling at 1.0' intervals along the terminal edge.


    Channel Instructions

    Channel Installation Diagram
    Step 1 - Site Preparation
    Prepare site to design profile and grade. Remove debris, rocks, clods, etc.. Ground surface should be smooth prior to installation to ensure blanket remains in contact with slope.


    Step 2 - Seeding
    Seeding of site should be conducted to design requirements or to follow local or state seeding requirements as necessary.


    Step 3 - Staple Selection
    At a minimum, 6" long by 1" crown, 11 gauge staples are to be used to secure the blanket to the ground surface. Installation in rocky, sandy or other loose soil may require longer staples.


    Step 4 - Excavate Anchor Trench and Secure Blanket
    Excavate a trench along the top of the slope to secure the upstream end of the blanket. The trench should run along the length of the installation, be 6" wide and 6" deep. Staple blanket along bottom of trench, fill with compacted soil, overlap blanket towards toe of slope and secure with row of staples (shown in Figures A, B and D).


    Step 5 - Secure Body of Blanket
    Roll blanket down slope from anchor trench. Staple body of blanket following the pattern shown in Figure C. Leave end of blanket unstapled to allow for overlap shown in Figure E. Place downstream blanket underneath upstream blanket to from shingle pattern. Staple seam as shown in Figure D. Secure downstream blanket with stapling pattern shown in Figure C. Stapling pattern shown in Figure C reflects minimum staples to be used. More staples may be required to ensure blanket is sufficiently secured to resist mowers and foot traffic and to ensure blanket is in contact with soil surface over the entire area of blanket.


    Step 6 - Continue Along Slope - Complete Installation
    Overlap adjacent blankets as shown in Figure F and repeat Step 5. Secure toe of slope using stapling pattern shown in Figure D. Secure edges of installation by stapling at 1.0' intervals along the terminal edge.